Municipal • Completed 2024
Seneca Falls WWTP
$6.8M State Grants + Loans
Seneca Falls, NY
2024 Complete
3M Gal Overflow Storage
3-million-gallon overflow tank with Preload specialists — protecting Finger Lakes water quality.
3M Gal
OVERFLOW STORAGE
$6.8M
STATE GRANTS + LOANS
Preload
PRESTRESSED CONCRETE
Wet Weather
PREVENTS OVERFLOW
Complete
2024
Project Gallery
[ MAIN PHOTO ]
[ PHOTO 2 ]
[ PHOTO 3 ]
[ PHOTO 4 ]
[ PHOTO 5 ]
Project Overview
Protecting Water Quality
The Town of Seneca Falls WWTP serves the community along the Seneca-Cayuga Canal. The new 3-million-gallon excess flow tank stores high-volume wastewater during heavy rain, allowing gradual treatment and reducing untreated overflows. Funded by $5.13M interest-free financing + $1.71M WIIA grant, secured April 2023 through NYS Environmental Facilities Corporation.
LRS partnered with Preload — industry leader in prestressed concrete tanks — to deliver critical site prep, excavation, utilities, and stormwater management.
Scope of Work
LRS Deliverables
LRS collaborated with Preload — specialists in prestressed concrete tanks — delivering the critical excavation and site preparation for this 3-million-gallon overflow storage system.
✓
Site preparation and excavation for large prestressed concrete tank foundation
✓
Utilities installation — storm drainage, electrical, catch basins
✓
Comprehensive grading and drainage systems
✓
Stormwater management and environmental controls during construction
Key Features
Project Highlights
◎
3M Gallon Tank
Excess flow storage
⊕
Preload Partner
Prestressed concrete specialists
≋
Overflow Prevention
Stores flow during heavy rain
$
$6.8M Funded
State grants + financing
⮣
Municipal Project
Town of Seneca Falls
↺
Water Quality
Seneca-Cayuga Canal
Technology & Approach
How We Deliver
Deep Excavation
Large-scale foundation prep for prestressed concrete tank
Specialist Partnership
Coordinated with Preload — industry leader in tank construction
EPA/DEC Compliance
Full alignment with NYSDEC and EPA standards
Stormwater Management
Environmental controls throughout active construction
Impact & Results
Project Impact
✓
Prevents sanitary sewer overflows, improving water quality in Seneca-Cayuga Canal
✓
Enhanced treatment plant capacity and reliability during wet weather
✓
Supported a $6.8M investment in local wastewater infrastructure
✓
Demonstrated ability to partner with top specialists like Preload on municipal projects