School / Athletic • Completed 2025
Lansing BOBCAT Field
$17M Total BOBCAT
Lansing, NY
July 2025 Complete
$6.6M Field Budget
Synthetic turf field, track, parking, stormwater basin — transforming Sobus Field for the community.
$17M
TOTAL BOBCAT
$6.6M
OF $17M TOTAL
Synthetic
ALL-WEATHER TURF
Basin
STORMWATER MANAGEMENT
Complete
JULY 2025
Project Gallery
[ MAIN PHOTO ]
[ PHOTO 2 ]
[ PHOTO 3 ]
[ PHOTO 4 ]
[ PHOTO 5 ]
Project Overview
Community-Driven Athletic Transformation
The Lansing Central School District invested ~$17 million in the BOBCAT project to modernize facilities. The athletic portion (~$6.6M) transformed Sobus Field with a new synthetic turf surface, updated track, improved parking, new lighting, and supporting infrastructure. Approved by voters January 2023 by a single vote after a larger version failed in 2022. Turf installation completed July 2025.
LRS provided critical surface site preparation, stripping & grading, utilities installation, drainage systems, and stormwater basin construction below the field.
Scope of Work
LRS Deliverables
LRS handled the essential surface and preparatory work to transform Sobus Field — including a critical stormwater basin constructed below the playing surface.
✓
Stripped existing natural grass field and track for new synthetic turf base
✓
GPS-guided grading for stable, level surfaces under turf and track
✓
Installed utilities — storm drainage, electrical systems, catch basins
✓
Constructed stormwater basin below the field for runoff management
✓
Improved parking lot above the field for better access and capacity
✓
Supported new lighting installation with site prep and coordination
Key Features
Project Highlights
◈
Synthetic Turf
All-weather playing surface
○
Updated Track
New competition surface
▦
Parking Lot
Improved access above field
✦
New Lighting
Night game capability
▽
Stormwater Basin
Hillside runoff management
✓
Community Vote
Approved by 1 vote
Technology & Approach
How We Deliver
GPS-Guided Grading
Precise level surfaces required for synthetic turf installation
Sub-Field Engineering
Stormwater basin construction integrated below playing surface
Utilities Coordination
Storm drainage, electrical, and catch basins across athletic complex
Public Project Standards
Full compliance with district and regulatory requirements
Impact & Results
Project Impact
✓
Created durable all-weather synthetic turf field and track for school and community use
✓
Enhanced safety, drainage, and accessibility with new utilities and stormwater basin
✓
Supported a community-driven $17M investment in local education and athletics
✓
Demonstrated expertise in athletic field prep, grading, and stormwater management