Home / Projects / Cornell Equine Park
Institutional • Completed 2024

Cornell Equine Park

$9.8M Total
Ithaca, NY
Fall 2024 Complete
14-15K SF Main Barn
Main barn replacement for Cornell Vet Medicine — modernizing facilities dating to the early 1900s.
$9.8M
TOTAL PROJECT
14-15K SF
L-SHAPED DESIGN
28-30
FULL EQUINE FACILITY
Built 1900s
DEMOLISHED & REPLACED
Complete
FALL 2024
Project Gallery
[ MAIN PHOTO ]
[ PHOTO 2 ]
[ PHOTO 3 ]
[ PHOTO 4 ]
[ PHOTO 5 ]
Project Overview

Modernizing Equine Facilities

The Cornell Equine Park underwent significant replacement and consolidation to update facilities originally built in the early 1900s. Demolished the main barn and smaller structures, replacing with a new 14,000-15,000 sq ft L-shaped horse barn (28-30 stalls, treatment areas, offices, classroom, lab) and a 3,200 sq ft commodities barn. Includes new paddocks, pastures, and energy-efficient features. Grand reopening fall 2024.
LRS provided critical site preparation, grading, utilities, drainage systems, and stormwater basin construction for this modern equine facility.
Scope of Work

LRS Deliverables

LRS handled essential site work to enable Cornell’s modernization of equine facilities that had served since the early 1900s.
✓
Site preparation and grading for new barn foundations, paddocks, and surrounding areas
✓
Utilities installation — storm drainage, electrical, catch basins
✓
Comprehensive drainage systems and stormwater basin construction
✓
Coordination with environmental controls and compliance during construction
Key Features

Project Highlights

⊞

28-30 Stalls

L-shaped horse barn
△

Lab & Classroom

Teaching and research
+

Treatment Areas

Equine clinical care
▭

New Paddocks

Pastures and turnout
↻

Replaced 1900s

Demolished and rebuilt
⚡

Energy Efficient

Sustainable design
Technology & Approach

How We Deliver

GPS-Guided Grading

Precision surfaces for barn foundations and paddock areas

Drainage Engineering

Stormwater basin construction for equine facility runoff

Environmental Controls

Compliance during construction near sensitive campus areas

Institutional Standards

Met Cornell’s rigorous project specifications
Impact & Results

Project Impact

✓
Centralized equine operations for improved teaching, research, and breeding
✓
Enhanced facilities for DVM student training and equine health advancements
✓
Supported Cornell’s mission in veterinary medicine and sustainability
✓
Demonstrated LRS expertise on institutional animal health projects